Skip to content

11+ maths · Proportion

Rates of work: working together worksheet

Combine the work done per day by two workers or taps by adding fractions, and solve builders-days-walls problems by counting builder-days.

19 questionsTwo worked examples

Use this worksheet on screen or print it with answers. Free to use, with no account needed.

A worksheet left part-done opens where it was left. New numbers can be chosen on it.

Before this worksheet

It helps to be comfortable with:

Worked examples

Read the steps, then try the worksheet yourself.

Worked example 1One builder takes 4 days to build a wall. With a second builder they take 3 days. How long would the second builder take alone?
  1. Together they do 1/3 of the wall a day; the first builder does 1/4 a day.
  2. The second does 1/3 − 1/4 = 4/12 − 3/12 = 1/12 a day.
  3. So alone the second builder takes 12 days
Worked example 24 builders take 2 days to build 3 walls. How long will 5 builders take to build 15 walls?
  1. 3 walls take 4 × 2 = 8 builder-days.
  2. 15 walls is 5 times as many: 5 × 8 = 40 builder-days.
  3. With 5 builders: 40 ÷ 5 = 8 days